Standard Plant Solution

Commercially viable solution for the liquefaction of smaller gas volumes typically associated with biogas. Bio-LNG can be used at source for power generation, fueling natural gas vehicles and bunkering, loaded into cryogenic containers and transported for regional use or vaporized and injected into the pipeline.

Technical Library

View and download our literature

BAHX in LNG Processes

A Key to LNG was first published in Hydrocarbon Engineering in October 2017

Scope of Supply

Complete engineering and equipment solution that can also be supplied as a full EPC turnkey project with tailored packages for commissioning, servicing and training. Typical overall project schedule, from order to plant start-up is 18 months.

Modular Construction

Chart’s Micro LNG plant utilizes proven, shop built standard components and mixed refrigerant cycle process technology for maximum reliability and ease of operation. Equipment packages are modularized for simplified installation and reduced time at site.

Specifications

Nameplate capacity of 15,000 gallons per day (25 tons per day). Turndown capability means that the plant will operate at reduced flows, duty and capacity. Mixed refrigerant process technology. Appropriate gas pre-treatment package. Shop built, standard, modular equipment packages. All modules are supplied skid mounted for road transport and easy installation.

Features

Standard package includes 3 days of cryogenic storage. Principal equipment engineered and built in-house. Overall plot plan required approx. 20 x 26m. Electric power source. Chart’s standard loadout is a 1 or 2 bay system with a simplified dispenser or pump skid, depending on plant size and transport frequency.

 

Connect with Chart

To learn more or to discuss your project requirements, please get in touch

Chart Americas  +1 800 400 4683

Chart Europe  +420 412 507 343

Chart China  +86 519 8596 6000

LNG@chartindustries.com